GUTL learning stage

Risk & Execution

Translate a planned loss budget into position size, then track drawdown as account equity changes. The two lessons cover reducing exposure, pausing new positions and retaining evidence of each trigger.

2 lessons · 17 min
Start the first lesson

Lessons in this stage

  1. Sizing a position from a risk budget 8 min

    Start with a risk budget per simulated trade and convert the distance to the stop into loss per unit. Allow for costs, round down to a tradable unit and check combined exposure.

  2. Drawdowns, leverage and stop rules 9 min

    Find the peak in an account equity series and calculate maximum drawdown. Report drawdown and notional exposure together, then write an actionable pause rule.

Why study position sizing and drawdown together?

Sizing estimates the loss one decision could impose. Maximum drawdown measures the peak-to-trough decline across many decisions. Together they connect individual plans, shared exposures and cumulative competition limits.

Student comments

Further reading

4 articles