On this page
In brief
A monetary measure of position scale derived from contract quantity, unit size and reference price. It is distinct from margin, equity and maximum possible loss.
Reading scale from contract specifications
Start with measurement units: barrels, ounces, tonnes, a currency-per-index-point multiplier, or base-currency units. Write units into the calculation to catch mismatches. Simple linear notional is contracts times unit size times reference price. Products with other conventions require their own specification rather than a multiplier borrowed from a similar name.
A position row should contain symbol, expiry, direction, contracts, unit size, price, currency and notional. Different expiries can have different prices and liquidity. A continuous futures chart is an observation series; a simulated order still needs a specific contract. Its splicing convention may differ from the executable contract price.
Comparing notional with collateral, equity and risk
If the fictional 3,000 position requires 300 of margin, the latter is collateral rather than exposure. With equity of 1,500, exposure is twice equity. Under a linear assumption, an adverse 5% underlying move loses about 150, or 10% of equity, before costs. Currency, gaps and nonlinear effects require additional modelling.
Long 5,000 and short 4,000 have gross notional of 9,000 and signed net notional of 1,000. Positions in different markets can both lose despite a small net amount. Basis, expiry and execution can weaken an apparent hedge. Notional organises scale; it does not establish equivalent risks across assets.
Rechecking scale as prices change
Market-based notional changes with price even at constant quantity. Equity may change too, altering exposure ratios. Convert foreign-currency positions at a consistent timestamp and preserve both local and reporting values. Currency translation is not a new trade, and amounts in different currencies cannot simply be added.
Compare fictional contracts of ten units at 100 and fifty units at 20: both have 1,000 notional. Apply different adverse price scenarios and observe different losses. Add costs and size increments to show why sizing must satisfy exposure, loss budgets and execution constraints, rather than merely matching monetary amounts.
Have one classmate reconstruct notional and another calculate P&L per unit price move. Under the same linear assumptions they should reconcile. Check multiplier, currency, direction and quantity when they do not. Options require further sensitivities, and a contract-size figure alone is not a complete risk assessment.
Interpret notional alongside leverage and use a risk budget to constrain scenario losses rather than treating notional itself as the expected loss.
The GUTL perspective
Translate a contract into quantities and currency before judging its size. One contract can represent very different economic scales. Notional gives a common unit but still needs sensitivities and scenarios.
Everyday example
A club books 100 meals at 30 each: the order is worth 3,000, even if its deposit is only 300. This separates a commitment’s size from the amount set aside to secure it.
Simulation example
A fictional contract represents 20 units priced at 50 each. Three contracts have notional of 3,000. A one-unit price decline loses 60 on the linear long position before costs.
Do two positions with equal notional have equal risk?
No. Volatility, structure, leverage, dependencies, liquidity and costs can differ. Align currency and timestamp, then compare justified scenarios as losses relative to equity.
Student comments
Further reading
3 articles-
Leverage
Taking exposure larger than the account capital committed. For a linear position, the exposure-to-equity multiple magnifies the effect of price moves on equity.
-
Risk budget
A planned loss allowance for a trade, portfolio or period. Position sizing uses the allowance and estimated loss per unit.
-
Futures contract
An exchange-traded standardised contract with an underlying instrument, contract size, expiry and settlement or delivery method.